- Electric Coils: Functionally test and verify the operation of each heating element circuit in the electric heating coils; replace failed elements. Consider replacement of coil control panels.
- Chilled water pump rebuild/replacement. Consider chilled water pump variable-speed drive.
Friday, November 16, 2007
Mechanical & Maintenance Line-Items
Topic: Identification of mechanical and maintenance line items for humidity control project and look-ahead maintenance budget.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment