Friday, November 16, 2007

Mechanical & Maintenance Line-Items

Topic: Identification of mechanical and maintenance line items for humidity control project and look-ahead maintenance budget.

  • Electric Coils: Functionally test and verify the operation of each heating element circuit in the electric heating coils; replace failed elements. Consider replacement of coil control panels.
  • Chilled water pump rebuild/replacement. Consider chilled water pump variable-speed drive.

No comments: